This project consists of 312 units in two 19-storey towers and a midrise, with over 10,000 sprinkler heads and a Safeway grocery store. A short deadline required a fast-paced schedule with grocery store turnover on an accelerated timeline.
Active Fire and Safety Services was proud to be a partner in the fire protection system that was designed and installed for this project by our expert team.